City of Newberry Lift Station #26
January 2021, your tax dollars at work to revitalize the school. Andrews Paving, Inc. was contracted to demo the existing lift station and replace it with a 10-foot diameter precast wet well with duplex sub, pumps, controls, emergency generator set, four 4-diameter precast manholes, 8-inch diameter PVS gravity server, and 8-inch force main and four ARV’s.